1425 Rockwell Avenue, Cleveland, Ohio, 44114
|

Build-to-Suit |
|
-
Existing telecommunications center is four adjacent buildings. One building of 125,000 square feet was recently demolished in order to create a development site.
-
Owner / developer to partner with premier data center contractors to build 180,000+/- square foot, multi-story data / technology center.
-
City, County and State have provided $3,750,000 combined grant and low-interest loans for project.
-
Looking for a partner or anchor tenant to launch project.
-
Partner / tenant can have significant input into development specifications while taking advantage of multiple cost-saving features in place (see below).
-
The existing 343,000+/- square foot facility and the proposed 180,000+/- square foot redevelopment for a multi-story technology center offer the following:
|

|
Redundant Power
Redundant Fiber
Redundant Water Line |
The Cleveland Technology Center sits atop a fiber optics node and was developed in 2000 as a telecommunications carrier hotel that currently houses four telecommunications tenants in 130,000+/- square feet of telecommunication switch gear. The out-parcels used as generator farms are positioned adjacent to the building. Existing infrastructure and amenities include:
|
POWER |
FIBER CONNECTIVITY |
SECURITY |
|
Power up to 20 MVA available (150 watts/sf)
Redundant power feed from two separate grids, underground lines from the Lakeshore and Hamilton substations
Current electric rates estimated at 6.5 ¢ to 7.5 ¢ per kilowatt hour
Two active generator farms on site |
Our current telecommunications tenants in the facility offer the following:
Redundant fiber feeds supplied by four independent telecommunication providers:
Qwest - OC-192, Nortel, Lucent 760 broadband and Ciena Corestream, as well as access to all telecoms
XO - E5 switch, central office
McLeod USA - OC-48 multi 5E switch, central office
City Net - OC-48, OC-3 and OC-12)
Overabundance of lit and dark fiber available on site |
Round-the-clock, manned, on-site security
Closed circuit TV surveillance
All entry points are accessed by card key
Internal passenger and freight elevator access controlled
All building facility systems are tied into a UPS battery back-up and on-site generator |
|