Figures
Tucson Industrial Figures Q4 2025
January 26, 2026 5 Minute Read
Looking for a PDF of this content?
‒Vacancy rose 150 basis points (bps) quarter-over-quarter in Q4 2025.
‒Delivered construction in the metro totaled 688,609 sq. ft.
‒Net Absorption remained in the negative as -35,451 sq. ft. of vacant space returned to the market.